Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Ankeny. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.” |
|
|
Technical #1
Technical Assignment 1 is an in depth analysis of the existing conditions of the project. The report includes information regarding schedule, cost, building systems, site plan consition, and project delivery methods.
Technical #2
Technical Assignment 2 is an in depth analysis of the costs and methods of the project. The report includes information regarding schedule, site planning, Assemblies estimate, structural system and general conditions.
Technical #3
Technical Assignment 3 contains a summary of the critical industry issues discussed during the PACE Roundtable. This document also identifies areas of my thesis project that are good candidates for my final proposal. This technical assignment will form a basis for my final thesis proposal. |
|
|