Header image

 

JIM GARZON

Construction Management

Apartment Complex

Anytown, USA

 
line decor
  
line decor
 
 
 
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Ankeny. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.”

 

 
 
Technical Assignments

 

 
 Technical #1
Technical Assignment 1 is an in depth analysis of the existing conditions of the project. The report includes information regarding schedule, cost, building systems, site plan consition, and project delivery methods.

 Technical #2
Technical Assignment 2 is an in depth analysis of the costs and methods of the project. The report includes information regarding schedule, site planning, Assemblies estimate, structural system and general conditions.

Technical #3
Technical Assignment 3 contains  a summary of the critical industry issues discussed during the PACE Roundtable. This document also identifies areas of my thesis project that are good candidates for my final proposal. This technical assignment will form a basis for my final thesis proposal.


 
 
 

Senior thesis Main Page / Penn State / AE / AE Computer Lab / Contact

This page was last updated on September 5th*, by Jim Garzon and is hosted by the AE Department ©20XX